¡¤Contact Us   ¡¤E-mail  ¡¤China  
  About Us  |  Certification  
 
 
Name:  Pwd:
 
 
   
Simple installation
1.Open the cap position so as to suit the direction of approach of the branch conductor. 2.Put the branch wire into the cap sheath fully. 3.Arrange the position of the connector on the main conductor.
4.Tighen the nut by hand, and fix the connector in suitable location. 5.Screw the nut with the sleeve. Don't use open ended spanner! 6.Screw the nut continually until the top part is cracked and dropped down.
 
 Products center more 
¡ö JMAEP
¡ö JMAEP£¨B£©
¡ö JMA2-95
¡ö JMA2-150
¡ö JMA3-95
¡ö JMA4-150
¡ö JMA5-150
¡ö JMA6
¡ö JMA240
¡ö JMA400
¡ö NLL
¡ö Hard ware fittings
¡ö Nylon Cable Tie

 The common questions and answers of ipc more 
Can the piercing way get good conection?
How is the heat condition after electrify?
How to use the armour and sheath?
Is IPC waterproof?
Can the crossde cable with hard insulated lay use it?
 
 
  HOME¡¡|¡¡ABOUT US ¡¡|¡¡PRODUCTS¡¡|¡¡MESSAGE¡¡|¡¡CONTACT¡¡|¡¡
YUEQING ZIYONG ELECTRICAL CO.,LTD ¡¡ ADD£ºSong Hu,Yueqing City Wenzhou, Zhejiang,China
Tel£º+86-577-27810592 27859836¡¡Fax£º+86-577-62561803¡¡P.C£º325600